JISE. Request a Quote
Robot-compatible racking OEM · Technical Datasheet

AGV / AMR Racking System

Rev 2026-09 · EN
Jiangsu JISE Intelligent Storage Equipment Co., Ltd.
↓ Download PDF

Racking engineered for robot operation — from light AGV shelving for goods-to-person picking to fleet-scale AMR tote racking. Frames are manufactured to the robot OEM’s interface drawings with batch consistency across thousands of units, so every robot in the fleet meets the same shelf at the same height. JISE has delivered more than 2 million tote locations for overseas projects of leading global integrators.

System composition

FrameUprights, beams, shelves and base plates (bolt-adjustable); corner-guard and floor-fixing options
Robot interfaceShelf heights, pick-face tolerances and station geometry to the integrator’s interface drawings (NDA-protected)
ManufactureWhite-label OEM, direct project supply, or frame-only supply ex-works/FOB
InstallationJISE overseas crews; install supervision for frame-only supply

Racking specification

System typesLight AGV shelving · AMR tote racking (goods-to-person) · pod / mobile-shelving frames
Unit loadLight shelving ≈50 kg per level; tote and pod racking engineered per project
Level adjustment50 / 75 mm pitch, tool-free repositioning; levels can be added or removed
SteelBaosteel feedstock, cold-roll-formed profiles; grade selected per project calculation
Surface finishElectrostatic powder coating 60–80 µm, adhesion GB/T 9286 Grade 0, salt spray >500 h
Batch consistencyFrame-to-frame dimensional consistency held across full production lots of thousands of frames
Design codesFEM 10.2.02 / EN 15512 design basis; project verification and FEA documentation

Why integrators source from JISE

Scale proof2,000,000+ tote locations delivered for overseas AMR projects
Single accountabilityOne factory for steel, coating, packing and installation — no broker stack
DocumentationMaterial certificates, coating reports and project FEA issued per shipment

Typical applications

E-commerce fulfilmentElectronicsPharmaceutical3PLMilitary & aerospace storesApparel

Reference installations

Poland — P3 project890,000+ tote locations, goods-to-person
Poland — LPP project670,000+ tote locations
Korea rollout450,000+ tote locations
UK & Australia220,000 + 140,000 tote locations

Unit loads, bay loads, beam sections and lane geometry are calculated per project and certified in project documentation — JISE does not publish generic load tables. Values above describe the delivered-system envelope, not a quotation.

Send this datasheet with your RFQ.

Attach your layout or interface drawings — engineering reply with a project-specific proposal within 48 hours.

Request a Quote →